5th Set of Production Photos for Wild Thing


Big progress on the construction of Wild Thing is apparent from these latest photos.
In this photo of the front interior area, you can see that the stairs to the loft bed have been installed and the upper cabinets in the loft area have been hung. The bathroom has a toilet and it looks like the frame for the countertop in the kitchen has been mounted!

 

 

The rear facing photo shows even more progress! The Refrigerator/Freezer is installed. I can see all the electronic brains of this trailer under the bench seating in the dining area. the kitchen upper cabinets are hung and the oven is in place. Wowza!

The exterior shows that the Escape graphics have been applied down the side and it looks like they are almost ready to apply the “Wild Thing” graphic to the front! The exterior hatch storage areas have doors on them now. There are two in the front under the nose. The upper one is storage and the lower one will house the two 20# propane tanks. There are two small hatches on the sides of the trailer. You can see the forward one open with the door attached just forward of the main entrance door.

 

 

Only 8 more days until she is complete!

Categories: Uncategorized

3 comments

  1. Definitely moving right along! Looking goooood Sarah!!

    Like

  2. Making progress!

    Like

Leave a comment